U11: Plug Arrangements for Alleviating Peak Loads
- 详细技术说明
- The invention is to load-shift time-deferrable devices by placing an electrical load scheduling mechanism in communication with an appliance. Delivery of electrical power to the appliance is scheduled via the electrical load scheduling mechanism based on assessed electrical grid load conditions. The scheduling includes altering a predetermined delivery of electric power to the appliance based on the assessed electrical grid conditions
- *Abstract
-
Methods and arrangements for load-shifting time deferrable devices. An electrical load scheduling mechanism is provided, and this is placed in communication with an appliance. Electrical grid load conditions are assessed, and delivery of electrical power to the appliance is scheduled via the electrical load scheduling mechanism. The scheduling includes altering a predetermined delivery of electric power to the appliance based on the assessed electrical grid conditions
- *IP Issue Date
- Aug 29, 2017
- *IP Type
- Utility
- 国家
- United States
- 申请号码
- 9,748,771
- 国家/地区
- 美国

欲了解更多信息,请点击 这里